Welcome to the Newyea Technology 7kW
(Ethernet version) AC Pile products.
1. Unpacking inspection
After the AC charging pile arrives, open
the package, and check whether the products are damaged or not and whether the
accessories are complete.
2. Read the instructions
Scan the instruction QR code attached to
the box. It is recommended to open it in browser mode. Read carefully the
installation precautions. Scan the QR code of the operation video to watch the
operation introduction.
3. Equipment installation
Put the product on the pearl cotton, loosen
the screw of the back cover with a Phillips screwdriver, and open the AC pile.
Turn off the 220V power supply switch. First, use scissors to cut any interface
in the rubber ring of waterproof joint, which is used to access the network
cable with crystal head. Thread L (Live wire), N (Neutral wire), PE (Earth
wire) and network cable into the waterproof connector of incoming line.
Finally, connect L (live wire), N (Neutral wire) and PE (Earth wire) to the
corresponding terminal post of the main board, and plug the crystal head into
the interface of the communication module. Be careful not to make the wrong
connection or there will be a risk of burning the machine. After checking that
the incoming line and communication connection network cable are correct, lock
the front and rear covers of the charging pile with a screwdriver and fix them
to the column or wall.
4. Power on for confirmation.
After power-on, wait for the system to be
networked. When the indicator light changes from red to green, the charging
pile displays the current date. Then press the emergency stop switch, and the
AC pile displays the serial number of the product. After the emergency stop
switch is released, press the emergency stop switch again. At this time, the
display shows the 8-digit pile number to indicate the successful networking.
5. Charging confirmation (mobile app)
Search for [Newyea charging] or open the
[Newyea charging] applet on the application mall to complete the registration.
Find the corresponding station in the list, select the corresponding pile
number and charge it. Here, you can confirm the product pile number by pressing
the AC pile emergency stop switch.
At the same time, you can also charge by
inputting the pile number through the sweep function. If there is no
corresponding pile number or network abnormality, please contact the relevant
after-sales personnel of Newyea Technology to handle it.
6. Troubleshooting
If the red light is always on, it is
equipment failure. Pay attention to the abnormal content on the display screen,
please refer to the troubleshooting methods in the instruction manual. If the
abnormality is still unresolved, please contact the relevant after-sales
personnel of Newyea Technology for treatment.